Cir. Memo.No. 1679742/MBNN/2022   dated: 28.03.2022

Sub: School Education dept - Mana Badi Nadu Nedu - Ceiling for the materials and Labour Charges for Phase-II-Issued - Regarding

Ref:- 

1. GO Ms No. 87 of the School Education (Prog-11) Department dated 30-11-2019
2.G.O. Ms No 22 of the school education (Pig 1) Department date! 06-05-2020.
3.G.OMS No 27 of the School Education (Prog-IT) Department dated 30.03.2021.

In the 1st  Phase of Mana Badi Nadu Nedu it is learns that the labourers and vendors have insisted to pay higher rates than local market price, citing reasons that is Government work in some places labor and vendors have formed as a pressure group and have demanded exorbitant rates

In the community contract system expected that the Parent Committee members, HM, Local Engineer shall negotiate and bargain for less rates compared to market rates as it is a public work which beneficial to students of the Village/Ward. 

In this context, attention the District Educational Officers, Additional Project Coordinators and Executive Engineers of all the implementing agencies of Mana Badi Nadu Nedu Pl II, program in this State is invited to the references cited above and they are requested to follow the Suggested normal Market rates of Material and Labor Charges for Phase-II works which are to be executed by the Parents Committee through Community Contract system, so as to not give any scope for misuse of funds by Paying higher rates. In case of interior pockets, hilly terrains, the maximum permissible market rates may be adopted.

The parent committees shall explore market rates and negotiate even below normal rates. In any case permissible maximum rates cannot be exceeded. Hence, it is requested to adopt the suggested normal market rates of material and Labour charges shown in the Annexure-I (for Material Rates) and Annexure-Il (for Labour Rates) enclosed.

 If the Market rates of Material and Labour Charges of a given Mandal are beyond Suggested Maximum Market rates given in Annexure I and II then they shall be approved by District level tender committee headed by the Joint Collector constituted as per GO MS No 27 date 30.03.2021.

The Joint Collector (Development) shall ensure the proper assessment of prevailing market rates by constituting a subcommittee which will enquire in the market and asses before approving rates in the committee.

ANNEX LTRE -1

SUGGESTED NORMAL/MAXIMUM MARKET RATES FOR MATERIALS (Including all taxes and
excluding transportation)

S. N o

Name of the Material

0                             )

* (1 unit = 10     cu ft

I

-Unit

Suggested
normal Rates
in Rs.

Suggested
Maximum Rates
in Rs

1

Gravel

100 cu ft

600

1000

2

Stone Dust (Path Ways and Basement Filling)

cu 100 ft

1000

1100

3

2mm Crushed Granite

100 cu ft

1200

1350

4

20mm Crushed Granite

100 cu ft

2400

2600

5

40mm Crushed Granite

100t
cu f

1300

1500

 

Steel Rates (ISI - FE-500 - KAMADHENU , SIMHADRI, ESSAR, SHREE TMT , TIRUMALA

 

 

 

6

8mm

KG

67

69

7

10mm

KG

65

68

8

12mm

XG

65

68

9

16mm

KG

65

68

10

20mm

KG

65

68

 

Htcf MS Iron Grills and flats Including welding charges

1 kg

85

90

12

MS Angles

1 kg

67

69

13

MS Squares Including welding Charges

1 kg

65

68

14

GI roofing Sheets (flat) size 1.00x3.00mts

1 kg

100

113

15

Red Brick (including transportation)

,

1 No.

7

9

 

Flooring Materials

 

 

 

16

Granite (Polished) any pattern,any size not less than 2 on any side 18 mm thick

1 Sft.

60

90

17

Rough Cuddapabblack slab 11"x23" 18mm thick

1 Sft.

18

22

18

Polished Cuddapah black slab (only for Kadapa District)11"x23" 18mm thick

I  Sft.

23

27

19

Betharncherla (Only for Kunrnool District)

1 Sit.

20

25

20

Tandur Polished stone size (23"x23")18min thick                                                                                      .

1  Sft.

28

32

.

ANNE XURE-II

SUGGESTED NORMAL/MAXIMUM RATES FOR LABOUR CHARGES

S.No

Name of the Material

Units

Suggested
Normal Rates
in Rs.

Suggested
Maximum
Rates in Rs.

1

Dismantling of CC Flooring

1 SFT

10

12

2

Dismantling of Rough/Polished Kadapa Flooring

1 SFT

10

12

3

Dismantling of Wall Tiles in Toilets

I SFT

8

9

4

Dismantling of Flooring Tiles in Tckilets/Rooms

1 SFT

8

10

5

Earth Work Excavation by Manual                                 I1CFT

20

25

6

Earth Work Excavation by machinery (JCB)

Per Hour

700

900

 

Construction of Toilets & ACRs (labour charges of all items including rod bending, centering, mixing, vibrating, concreting, including architectural element etc., finished item of work.) excluding material costs

 

 

 

a

Ground floor

1 SFT

270

300

b

First floor

1 SFT

220

240

c

Second floor

1 SFT

240

270

8

Laying of Wall Tiles in Toilet

1 SFT

14

16

9

Laying of Flooring Tiles in Class Rooms/ Toilet

1 SFT

14

15

10

Laying of parking tiles

1 SFT ,

12

15

11

Laying of Granite in Class Room/Verandah

1 SFT

25

30

12

Laying of Granite @ Staircase

1 SFT

25

30

13

Laying of Rough/ Polished Black Slabs in Class Room/Veranda

1 SFT

20

25

14

Electrification Charges / Each Room Including Groove cutting and Yerandha)

1Room

2B00

3200

15

For Sanitary Fittings (1 wash basin, 1 flush, 1 Water Closet including flush tank, Taps with pipe line)

1 Toilet

a

1 Wash Basin

1No

700

800

b

1 Water Closet Indian type including flush Tank

1NO

800

i000

c

1 Water Closet Westren type including flush Tank

I NO

800

1000

d

1 Urinal bowl

1NO

400

500

16

RCC Over Head Tank Labour Charges

lLtr

7

9

17

Over Head Tank Labour Charges (Rings based cast in

situ)

lLtr

5

i -7

 